A new main hung the length of a hand-dug tunnel
A new main hung the length of a hand-dug tunnel — 2 of 3
A new main hung the length of a hand-dug tunnel — 3 of 3

3 photographs from this job

Under-slab tunneling

A new main hung the length of a hand-dug tunnel

Hangers set the whole way so the fall stays constant instead of settling into a belly, and long sweeps instead of tight turns — the same change of direction without the place a wipe can catch.

Branch drains cut in and re-hung underneath
Branch drains cut in and re-hung underneath — 2 of 2

2 photographs from this job

Under-slab tunneling

Branch drains cut in and re-hung underneath

Every fixture group in the house brought back to one new main, photographed while the tunnel is still open because this is the last time anyone will see it.

Daylight at the far end of the tunnel
Daylight at the far end of the tunnel — 2 of 2

2 photographs from this job

Under-slab tunneling

Daylight at the far end of the tunnel

Looking back down a finished run to the exit pit. Everything between the camera and that opening is new pipe.

Traps, arms and branches rebuilt in place
Traps, arms and branches rebuilt in place — 2 of 3
Traps, arms and branches rebuilt in place — 3 of 3

3 photographs from this job

Under-slab tunneling

Traps, arms and branches rebuilt in place

Not patched around the failed section — the whole assembly under the slab replaced, then tied back to the stack that stays.

A wye and a riser where the line leaves the house

Sewer line replacement

A wye and a riser where the line leaves the house

Brought up to grade and capped, in the lawn rather than under the flowerbed. The next camera inspection should not have to start with a shovel.

Routed past the condenser by hand

Sewer line replacement

Routed past the condenser by hand

Working around what is already in the yard is most of the job on a narrow side lot — and the line and the refrigerant runs both came out of it intact.

Where the new pipe meets what stays

Under-slab tunneling

Where the new pipe meets what stays

The transition made in the open, under the slab, supported and checked before anything is covered over.

A new assembly dropped in at the foundation

Sewer line replacement

A new assembly dropped in at the foundation

Long sweeps rather than tight turns, dry-fit and levelled in the hole before a single joint was cemented.

Three days in one back yard
Three days in one back yard — 2 of 15
Three days in one back yard — 3 of 15
Three days in one back yard — 4 of 15
Three days in one back yard — 5 of 15
Three days in one back yard — 6 of 15
Three days in one back yard — 7 of 15
Three days in one back yard — 8 of 15
Three days in one back yard — 9 of 15
Three days in one back yard — 10 of 15
Three days in one back yard — 11 of 15
Three days in one back yard — 12 of 15
Three days in one back yard — 13 of 15
Three days in one back yard — 14 of 15
Three days in one back yard — 15 of 15

15 photographs from this job

Sewer line replacement

Three days in one back yard

Dug on the Monday, pipe in and tested by the Thursday. The last frames are the line standing full of water in front of the homeowner, which is the part of the job worth watching.

Five branch lines replaced without opening a floor
Five branch lines replaced without opening a floor — 2 of 3
Five branch lines replaced without opening a floor — 3 of 3

3 photographs from this job

Under-slab tunneling

Five branch lines replaced without opening a floor

Everything under this house was reached from a hand-dug tunnel outside it. No slab cut, no cabinets pulled, no tile lifted.

Bathroom stripped back to the studs
Bathroom stripped back to the studs — 2 of 2

2 photographs from this job

Bathroom remodel

Bathroom stripped back to the studs

Tile, tub and substrate out, so the supply and drain lines behind them get replaced rather than reconnected. The trap comes up with the floor.

Carried around the corner and back into the slab
Carried around the corner and back into the slab — 2 of 2

2 photographs from this job

Sewer line replacement

Carried around the corner and back into the slab

One continuous run around two sides of the house. The hole stays open and the tape stays up until it has been signed off.

Every drain in the house, replaced under the floor
Every drain in the house, replaced under the floor — 2 of 6
Every drain in the house, replaced under the floor — 3 of 6
Every drain in the house, replaced under the floor — 4 of 6
Every drain in the house, replaced under the floor — 5 of 6
Every drain in the house, replaced under the floor — 6 of 6

6 photographs from this job

Drain line replacement

Every drain in the house, replaced under the floor

Pier-and-beam, so the floor came up rather than the slab coming out. Old cast iron out of the joist bays, new PVC run, sloped and strapped at the code interval so nothing sags into a low spot later.

A main line replaced end to end, then filled and held
A main line replaced end to end, then filled and held — 2 of 9
A main line replaced end to end, then filled and held — 3 of 9
A main line replaced end to end, then filled and held — 4 of 9
A main line replaced end to end, then filled and held — 5 of 9
A main line replaced end to end, then filled and held — 6 of 9
A main line replaced end to end, then filled and held — 7 of 9
A main line replaced end to end, then filled and held — 8 of 9
A main line replaced end to end, then filled and held — 9 of 9

9 photographs from this job

Sewer line replacement

A main line replaced end to end, then filled and held

Grade set off a string rather than a guess, every branch given a wye and every wye somewhere to put a camera. It ends the way all of these should: plugged, filled, and holding.

Patio cut, numbered, and set aside

Sewer line replacement

Patio cut, numbered, and set aside

The slabs go back down the way they came up. Most of what makes a dig bearable for the homeowner happens before the digging starts.

A run dug by hand down a three-foot side yard
A run dug by hand down a three-foot side yard — 2 of 2

2 photographs from this job

Sewer line replacement

A run dug by hand down a three-foot side yard

Brick wall on one side, fence on the other, and nothing that fits between them except a shovel. The kitchen drain inside was rebuilt onto the same new line.

Walkway back down, cleanout left flush
Walkway back down, cleanout left flush — 2 of 2

2 photographs from this job

Sewer line replacement

Walkway back down, cleanout left flush

This is the whole job as the neighbours saw it. The access point ends up level with the soil, capped, and easy to find again in five years.

Plugged, filled, and left overnight

Bathroom remodel

Plugged, filled, and left overnight

A shower pan gets tested before it gets tiled, because the only cheap time to find a leak is now.

Liner in, flood-tested, mud bed on top
Liner in, flood-tested, mud bed on top — 2 of 3
Liner in, flood-tested, mud bed on top — 3 of 3

3 photographs from this job

Bathroom remodel

Liner in, flood-tested, mud bed on top

40 mil run up the curb and held overnight, then a bed floated over it with even fall to the strainer from every direction.

What seventy years does to cast iron

Sewer line replacement

What seventy years does to cast iron

Sections of the original line stacked where they came out — scaled almost shut, and open at the joints where the roots got in.

A tankless stripped down rather than swapped out
A tankless stripped down rather than swapped out — 2 of 2

2 photographs from this job

Water heater

A tankless stripped down rather than swapped out

Panel off, heat exchanger descaled, burner serviced, control board checked. A replacement would have been an easier sell and the wrong call.

New gas run to a standby generator
New gas run to a standby generator — 2 of 3
New gas run to a standby generator — 3 of 3

3 photographs from this job

Gas line

New gas run to a standby generator

Coated poly with a fused tee, sized for what the generator actually draws rather than for what fits in the trench. Tracer wire and warning tape in before backfill.

The root that found the joint
The root that found the joint — 2 of 2

2 photographs from this job

Sewer line replacement

The root that found the joint

Pulled out of the ground still wrapped around the failure. A slow backup inside the house usually looks like this from outside it.

Valve set, PEX run, wall ready to close
Valve set, PEX run, wall ready to close — 2 of 2

2 photographs from this job

Repipe

Valve set, PEX run, wall ready to close

Rated and stamped pipe, set to finished-wall depth and secured to the framing. Everything that has to be right before anybody sees any of it.

Old cast iron out, new PVC in, yard put back
Old cast iron out, new PVC in, yard put back — 2 of 6
Old cast iron out, new PVC in, yard put back — 3 of 6
Old cast iron out, new PVC in, yard put back — 4 of 6
Old cast iron out, new PVC in, yard put back — 5 of 6
Old cast iron out, new PVC in, yard put back — 6 of 6

6 photographs from this job

Sewer line replacement

Old cast iron out, new PVC in, yard put back

The line that failed and the line replacing it, side by side in the same trench before the old one leaves the property. The last frame is what the family came home to.

Shower rebuilt from the studs out
Shower rebuilt from the studs out — 2 of 3
Shower rebuilt from the studs out — 3 of 3

3 photographs from this job

Bathroom remodel

Shower rebuilt from the studs out

Waterproof board bonded to the studs and every seam sealed, then the pan sloped and the drain set, then tile straight over the top of it. The niche in the first frame is the one being tiled in the last.